FY 2008 Public Lands Highways Discretionary (PLHD) Awards

Amount of funds awarded: $70,925,921
Number of projects selected: 75

State

Project

Funding Amount (1)

Alabama

U.S. Forest Highway 9, Winston County, Alabama

$898,774.00

Arizona

Highway Improvements in Sells, AZ

$898,774.00

Arizona

Hoover Dam Bypass Bridge, AZ

$1,797,546.00

Arizona

Paving of FS 512 (Young Road), AZ

$674,080.00

Arizona

Road from Hardrock to Pinon, AZ (Navajo Reservation)

$674,080.00

California

Bald Hill Slide Mitigation and Repair Project, CA

$898,774.00

California

Forest Highway 171 Widening, Butte County, CA

$898,774.00

California

Golden Gate National Park Conservancy, Park Access and Trails, San Francisco, CA

$2,696,321.00

California

Needles Highway, Needles, CA

$2,067,180.00

California

Pacific Way Bridge, Marin County, CA

$449,387.00

California

South Access to Golden Gate Bridge, Doyle Drive, CA

$1,348,161.00

Colorado

SH 115, CO

$449,387.00

Colorado

SH 13 from Wyoming State Line South through CO

$449,387.00

Colorado

SH9, Frisco to Breckenridge, CO

$898,774.00

Colorado

State Highway 150 (US 160N to Great Sand Dunes), CO

$2,031,229.00

Colorado

U.S. 491, Montezuma County, CO

$898,774.00

Delaware

Chesapeake and Delaware Canal Recreation Trail, DE

$629,142.00

Florida

Sharpes Ferry Bridge Replacement, Marion County, FL

$898,774.00

Hawaii

Federal Lands Program, State of HI

$1,051,565.00

Idaho

City of Rocks Back Country Byway, ID

$3,550,156.00

Idaho

FH-24, Banks to Lowman, ID

$449,387.00

Kansas

Reconstruction of K-20 between US75 and Horton, KS

$224,693.00

Maryland

APG Highway Access, Aberdeen Proving Ground, MD

$224,693.00

Maryland

BRAC Related Improvements, Harford County, MD

$1,806,535.00

Maryland

BRAC/MD 355--Transportation Analysis, Bethesda, MD

$1,806,535.00

Maryland

MD 175 Improvements, Anne Arundel County, MD

$449,387.00

Maryland

MD 4 at Suitland Parkway, Prince George's County, MD

$2,246,934.00

Maryland

U.S. 15 at Monocacy Boulevard, Frederick, MD

$224,693.00

Maryland

Western Maryland Welcome Center Frederick Co MD

$224,693.00

Massachusetts

Riverwalk Construction Phase 2 Section 3, Lowell, MA

$898,774.00

Minnesota

MN TH 38 Improvements, MN

$449,387.00

Mississippi

SR 601 from I-10 to SR 26, MS

$898,774.00

Mississippi

Tupelo Thoroughfare Corridor, Tupelo, MS

$898,774.00

Missouri

Safety Project on Environmental Effects of Dust Suppressant Chemicals on Federal Lands Highways, MO

$1,179,641.00

Montana

Montana Secondary 323 from Ekalaka to Alzada, MT

$1,438,038.00

Nebraska

Valentine National Wildlife Refuge Roads, NE

$269,632.00

Nevada

Carson Freeway, Phase 2, Carson City, NV

$898,774.00

Nevada

Craig Road Grade Separation/Overpass, NV

$449,387.00

Nevada

I-15 Corridor Study, NV

$224,693.00

Nevada

I-80 at Vista Boulevard and McCarran Boulevard, NV

$674,080.00

Nevada

Southern Nevada Beltway Interchanges, NV

$988,651.00

Nevada

SR-160 Blue Diamond Highway-Clark and Nye Counties, NV

$1,348,161.00

Nevada

U.S. 93/Interstate 15 interchange, NV

$629,142.00

New Mexico

West Jemez Bypass Construction, Los Alamos County, NM

$1,204,357.00

New York

Fort Drum Connector Road, NY

$719,019.00

New York

Hudson Valley Welcome Center, Hyde Park, NY

$1,550,385.00

North Carolina

Blue Ridge Parkway, Asheville, NC

$898,774.00

North Carolina

NC 143 in Graham County, NC

$674,080.00

North Dakota

Lewis and Clark Legacy Trail, ND

$481,743.00

North Dakota

Three Affiliated Tribes Wells Road, ND

$898,774.00

Ohio

Granger Road/Transportation Boulevard Improvement, OH

$898,774.00

Ohio

Improved Access to Cuyahoga Valley National Park, OH

$449,387.00

Oklahoma

Sequoyah Refuge Road, Sequoyah, OK

$449,387.00

Oklahoma

United Keetowah Band Tribal Roads, Tahlequah, OK

$449,387.00

Oregon

I-84 Sandy River Delta Project, Salem, OR

$898,774.00

South Dakota

BIA Route 14 (Gooseneck Road)-Oglala Sioux Tribe, SD

$1,520,725.00

South Dakota

Kenel Road Rehabilitation and Resurfacing-Standing Rock Sioux Tribe, SD

$1,797,546.00

South Dakota

Pave from Sitting Bull Monument to US 12 and from US 12 to north of SD 1806P from SD 1806 to end of pavement in Wakpala, SD

$533,512.00

South Dakota

SD 44 and SD 73, Paving in Jackson and Mellette Counties, SD

$566,227.00

South Dakota

US 212 Paving from Eagle Butte to East of the SD 63 East Junction, Serving Cheyenne River Reservation, SD

$629,142.00

Tennessee

State Route 374 from SR 149 to 77 Montgomery Co,TN

$449,387.00

Tennessee

Stones River National Battlefield Tour Route, TN

$898,774.00

Utah

Bear River Access Road Forest Street Improvements Project, UT

$786,427.00

Utah

Halchita Bridge, San Juan County, UT

$449,387.00

Utah

State Route 92, Lehi to Highland, UT

$449,387.00

Vermont

Vermont Federal Lands Projects, VT

$301,089.00

Virginia

14th Street Bridge/GW Memorial Parkway, VA

$2,696,321.00

Virginia

Route 1/619 Traffic Circle at Quantico, VA

$449,387.00

Washington

116th Street NE Interchange Improvement Project, Tulalip Tribes, WA

$943,712.00

Washington

Discovery Trail, Long Beach to Port of Ilwaco, WA

$337,040.00

Washington

Fidalgo Bay Improvement Project, Samish Tribe, WA

$449,387.00

Washington

Skomish Tribe Access Road and US 101 Realignment, WA

$898,774.00

Washington

Welcome Center on SR 410, WA

$674,080.00

Wyoming

17-Mile Road Reconstruction, Wind River Indian Reservation, WY

$1,887,425.00

Wyoming

Grand Teton National Park Pathways System, WY

$1,572,854.00

TOTAL

$70,925,921.00

 

(1)       All FY2008 PLHD funds were designated for specific projects by Congress in the joint explanatory statement accompanying the FY2008 Consolidated Appropriations Act (Public Law 110-161). SAFETEA-LU authorized $98.6 million for PLHD for FY 2008.  After the rescission of $21,264,182 required by Section 186 of the Division K of the FY2008 Consolidated Appropriations Act (Public Law 110-161), and takedowns of 0.5% for Lake Tahoe transportation planning activities required by Section 101(n) of the SAFETEA-LU Technical Corrections Act of 2008 (Public Law 110-244), and 7.7% for FY2008 obligation limitation lop-off under SAFETEA-LU Section 1102(f), $70,925,921 is available for PLHD projects.  Per Section 186 of Division K of the FY 2008 Consolidated Appropriations Act, all of the projects were designated for funding at the level of 98 percent of the corresponding amounts identified in the Joint Explanatory Statement accompanying that act.