Bid Tabulations
Bid tabulations show the amount bid by each bidder for each pay item in a contract. They are posted as soon as the Contracting Officer certifies that a bid tab accurately reflects the bids received and publicly opened. Fiscal years run from October 1 through September 30 of the following year. So, for example, FY 2016 runs from October 1, 2015 through September 30, 2016. Click on a link below to view details for a specific contract.
Filter by:
Current View: There are 21 records in 2010, CFL, all states.
| 2010 | CFL | AZ | AZ BLM 93-1(1) |
Monolith Gardens Trailhead Turnoff |
| 2010 | CFL | AZ | AZ PFH 49-1(1) and AZ ERFO 49-1(2) |
Apache Trail Retaining Walls |
| 2010 | CFL | CO | CO/WY PRA/NPS IMR PRES 1(10) |
Colorado Parks Pavement Preservation |
| 2010 | CFL | TX | TX PRA BIBE 11(2), 13(4), 233(1) & TX BIBE ERFO (5) |
|
| 2010 | CFL | CA | CA PFH 119-1(3) |
Quincy-Oroville Road |
| 2010 | CFL | WY | WY HPP4-1(6) |
Beartooth Highway (U.S. 212) |
| 2010 | CFL | ND | ND RRP CLSA 12(2) |
Auto Tour Route |
| 2010 | CFL | CA | CA PRA SEKI 201(1) |
Kings River Bridge |
| 2010 | CFL | OK | OK RRP WIMO 11(1) & 10(1) |
Wichita Mountains NWR |
| 2010 | CFL | CA | CA BLM 19006(1) |
Panoche Access Road & Trailhead |
| 2010 | CFL | NM | NM PRA BAND 200(1) & NM BLM 1011(1) |
Juniper Campground & Tent Rocks Road |
| 2010 | CFL | AZ | GRCA PRES 1(10) |
Grand Canyon National Park Pavement Preservation |
| 2010 | CFL | CA | CA PFH 138-1(1) |
Mammoth Scenic Loop |
| 2010 | CFL | TX | TX NPS BIBE PRES 1(10) |
Big Bend Pavement Preservation |
| 2010 | CFL | AZ | AZ PRA CACH 10(2) |
South Rim Drive |
| 2010 | CFL | UT | UT PRA ZION 10(5) |
Zion-Mt. Carmel Highway Switchbacks |
| 2010 | CFL | CA | CA SEKI 10(8) |
Generals Highway |
| 2010 | CFL | CA | CA PRA YOSE 14(4) |
Wawona Road |
| 2010 | CFL | SD | SD PFH 17-1(6) |
Hill City to Lead |
| 2010 | CFL | AZ | AZ/NV HPP 93(5) |
Hoover Dam Bypass, Final Roadway Improvements |
| 2010 | CFL | AZ | AZ PFH 43-1(4) |
Sunrise Park-Big Lake Road |

