Archived Bid Tabulations

As of October 1, 2021 all Bid Tabulations are now posted with their respective project on SAM.gov.

Fiscal years run from October 1 through September 30 of the following year. So, for example, FY 2020 runs from October 1, 2019 through September 30, 2020. Click on a link below to view details for a specific contract.

Filter by:

Fiscal Year:     Division:     State:

Current View: There are 31 records in 2016, EFL, all states.

FY
Div
State
Project Number
Project Name and Files
2016 EFL NC BLRI 2P19, T14
Blue Ridge Parkway - Tunnel Repairs
Acrobat Icon PRA-BLRI-2P19-T14.pdf  (Acrobat, 613 KB)
2016 EFL MS FTNP-NATR 3C12, D32
NATCHEZ TRACE PARKWAY 3C12, D32
Acrobat Icon FTNP-NATR-3C12-D32.pdf  (Acrobat, 701 KB)
2016 EFL OH OH NPS-CUVA 040S(1)
Hillside Pedestrian Bridge
Acrobat Icon NPS-CUVA-040S(1).pdf  (Acrobat, 75 KB)
2016 EFL AL PRA-NATR 2B5_2nd Adv
John Coffee Memorial Bridge Over Tennessee River
Acrobat Icon PRA-NATR-2B5.pdf  (Acrobat, 77 KB)
2016 EFL VA VA VA ERFO FS 2013-1(1)
HITE HOLLOW ROAD
Acrobat Icon VA-ERFO-FS 2013-1(1).pdf  (Acrobat, 80 KB)
2016 EFL MN MWR PMS MN(1)
PAVEMENT PRESERVATION OF ROADS AND PARKING AREAS
Acrobat Icon MWR-PMS-MN(1).pdf  (Acrobat, 136 KB)
2016 EFL VI VI-38(2) C1
Raphune Hill Intersection Improvements
Acrobat Icon VI 38(2)-C1.pdf  (Acrobat, 136 KB)
2016 EFL GA GA GA FLTP CE WFG LOCK(1)
Walter F. George Lock and Dam
Acrobat Icon GA-FLTP-CE-WFG-LOCK(1).pdf  (Acrobat, 80 KB)
2016 EFL VI VI NP-VIIS 20(1)
Construction of Gabion Walls Along North Shore Road
Acrobat Icon NP-VIIS-20(1).pdf  (Acrobat, 84 KB)
2016 EFL AR AR AR FLAP POLK 64(1)
Reconstruction of County Road 64
Acrobat Icon AR-FLAP-POLK-64(1).pdf  (Acrobat, 53 KB)
2016 EFL NC NC ERFO FSR 2013-1(2)
Nantahala National Forest, Tuni Gap Road
Acrobat Icon NC-ERFO-FSR-2013-1(2).pdf  (Acrobat, 148 KB)
2016 EFL NC NC NC ERFO FSR 2013-2(1)
PISGAH NATIONAL FOREST
Acrobat Icon NC-ERFO-FSR-2013-2(1).pdf  (Acrobat, 198 KB)
2016 EFL TN TN FW LIS 10(1)
Boundary Line Road
Acrobat Icon FW-LIS-10(1).pdf  (Acrobat, 91 KB)
2016 EFL NH FW-GREA 10(1)
Rehabilitation of Merrimac Drive, Visitor Parking Area, and Arboretum Drive
Acrobat Icon FW-GREA-10(1).pdf  (Acrobat, 155 KB)
2016 EFL VA VA FTNP-BLRI 1L8
BLUE RIDGE PARKWAY
Acrobat Icon FTNP-BLRI-1L8.pdf  (Acrobat, 54 KB)
2016 EFL FL FTNP-GUIS 11(2), 12(2)
GULF ISLANDS NATIONAL SEASHORE
Acrobat Icon FTNP-GUIS-11(2)- 12(2).pdf  (Acrobat, 111 KB)
2016 EFL NY NP-UPDE 10(1)
Rehabilitation Of Roebling Bridge
Acrobat Icon NP-UPDE-10(1).pdf  (Acrobat, 182 KB)
2016 EFL MS FTNP-NATR 3A16, 3B8
NATCHEZ TRACE PARKWAY
Acrobat Icon FTNP-NATR-3A16-3B8.pdf  (Acrobat, 341 KB)
2016 EFL MS FTNP-NATR 3R13
NATCHEZ TRACE PARKWAY
Acrobat Icon FTNP-NATR-3R13.pdf  (Acrobat, 69 KB)
2016 EFL MD NP-NCR PMS WV(1), MD(1)
Harpers Ferry National Historical Park and Monocacy National Battlefield
Acrobat Icon NP-NCR-PMS-WV(1)-MD(1).pdf  (Acrobat, 101 KB)
2016 EFL MN FW-TAMA 10(1), 900(1)
Tamarac National Wildlife Refuge
Acrobat Icon FW-TAMA-10(1)-900(1).pdf  (Acrobat, 110 KB)
2016 EFL GA FTNP-FOPU 10(3)
REPLACEMENT OF FORT PULASKI ENTRANCE BRIDGE
Acrobat Icon FTNP-FOPU-10(3).pdf  (Acrobat, 234 KB)
2016 EFL LA FW-TERI 11(1)
REHABILITATION OF WILDLIFE DRIVE (ROUTE 11) AND DRAINAGE IMPROVEMENTS
Acrobat Icon FW-TERI-11(1).pdf  (Acrobat, 174 KB)
2016 EFL TN FW-REEL 100(1)
Reelfoot National Wildlife Refuge
Acrobat Icon FW-REEL-100(1).pdf  (Acrobat, 113 KB)
2016 EFL TN NP-SHIL 11(1), 18(1)
SHILOH NATIONAL MILITARY PARK
Acrobat Icon NP-SHIL-11(1)-18(1).pdf  (Acrobat, 300 KB)
2016 EFL SC FW ACBA 100(1)
Ace Basin National Wildlife
Acrobat Icon FW-ACBA-100(1).pdf  (Acrobat, 142 KB)
2016 EFL GA NP-OCMU 10(2)
Ocmulgee National Monument
Acrobat Icon NP-OCMU-10(2).pdf  (Acrobat, 74 KB)
2016 EFL VA FW-CHN 10(1)
CHINCOTEAGUE NATIONAL WILDLIFE REFUGE
Acrobat Icon FW-CHN-10(1).pdf  (Acrobat, 102 KB)
2016 EFL VA NP-GWMP MVT(3)
George Washington Memorial Parkway
Acrobat Icon NP-GWMP-MVT(3).pdf  (Acrobat, 85 KB)
2016 EFL SC NP-SER PMS FY16(2)
NPS SOUTHEAST REGION PAVEMENT PRESERVATION
Acrobat Icon NP-SER-PMS-FY16(2).pdf  (Acrobat, 70 KB)
2016 EFL MO MO NP OZAR 2013-1(1)
RELOCATION OF BAPTIST ACCESS PARKING ROAD, ALLEY SPRING CAMPGRO
Acrobat Icon MO-NP-OZAR-2013-1(1).pdf  (Acrobat, 71 KB)