Archived Bid Tabulations
As of October 1, 2021 all Bid Tabulations are now posted with their respective project on SAM.gov.
Fiscal years run from October 1 through September 30 of the following year. So, for example, FY 2020 runs from October 1, 2019 through September 30, 2020. Click on a link below to view details for a specific contract.
Filter by:
Fiscal Year:
Division:
State:
Current View: There are 29 records in 2017, WFL, all states (sorted by Fiscal Year in descending order).
2017 | WFL | MT | MT FERGUS 2016(1) |
Horse Ranch Road Bridge Replacement MT-FERGUS-2016(1).pdf (Acrobat, 136 KB) |
2017 | WFL | MT | MT DAR 2016(2) |
2016 By Mile - Wheatland Area MT-DAR-2016(2).pdf (Acrobat, 103 KB) |
2017 | WFL | AK | AK NPS DENA 10(44) |
Repave Denali Park Road MP 3.4 To 14.7, Phase II AK-NPS-DENA-10(44).pdf (Acrobat, 592 KB) |
2017 | WFL | MT | MT SWEETGRASS 210(1) |
Main Boulder River Road Improvements MT-SWEETGRASS-210(1).pdf (Acrobat, 170 KB) |
2017 | WFL | WA | WA PRA NOCA 10(6) |
Stehekin Valley Road, Phase II WA-PRA-NOCA-10(6).pdf (Acrobat, 119 KB) |
2017 | WFL | MT | MT BEAVERHEAD 273(1) |
Elk Lake Road MT-BEAVERHEAD-273(1).pdf (Acrobat, 132 KB) |
2017 | WFL | OR | OR DOT CRGNSA 100(1); OR DOT CRGNSA 100(3); OR HOODRIVER 18(1) |
Historic Columbia River Highway State Trail; Historic Columbia River Highway Summit Creek Viaduct; Wyeth Trailhead OR-DOT-CRGNSA-100(1)-100(3)-HOODRIVER-18(1).pdf (Acrobat, 667 KB) |
2017 | WFL | WA | WA NPS OLYM 11(9); WA CLALLAM 92210(1) |
Rehabilitate Route 11, Lake Crescent Road (US Hwy 101); East Beach Road WA-NPS-OLYM-11(9)-WA-CLALLAM-92210(1).pdf (Acrobat, 150 KB) |
2017 | WFL | OR | OR PFH 46(13) |
Fall Creek Bridge Replacement OR-PFH-46(13).pdf (Acrobat, 147 KB) |
2017 | WFL | ID | ID CANYON 2013(1) |
Riverside Road and Lake Shore Drive Rehabilitation ID-CANYON-2013(1).pdf (Acrobat, 113 KB) |
2017 | WFL | AK | AK TTP CHIC 2013(1) |
Dene Tene Pedestrian Path AK-TTP-CHIC-2013(1).pdf (Acrobat, 121 KB) |
2017 | WFL | AK | AK FS TNF 2(1) |
Auke Recreation Roadway Rehab AK-FS-TNF-2(1).pdf (Acrobat, 36 KB) |
2017 | WFL | WA | WA PFH 29-1(5) |
Middle Fork Snoqualmie River Road Slope Stabilization WA-PFH-29-1(5).pdf (Acrobat, 63 KB) |
2017 | WFL | OR | OR DOT 36 (1) |
OR 36 - Florence-Eugene Highway to Greenleaf Creek OR-DOT-36(1).pdf (Acrobat, 1.19 MB) |
2017 | WFL | AK | AK DOT 135(5) |
Glenn Highway Rehabilitation West Chickaloon Grade Section: MP 77.4 to 87.2 AK-DOT-135(5).pdf (Acrobat, 143 KB) |
2017 | WFL | MT | MT DAR 2017(1) |
Minuteman Missile Base Roads 2017 MT-DAR-2017(1).pdf (Acrobat, 599 KB) |
2017 | WFL | MT | MT BOR 2015(1) |
Fresno Reservoir Road MT-BOR-2015(1).pdf (Acrobat, 109 KB) |
2017 | WFL | WA | WA NPS NOCA 20(1) |
Skagit River Bridge Repair WA-NPS-NOCA-20(1).pdf (Acrobat, 109 KB) |
2017 | WFL | OR | OR BLM ERFO 151-3301 |
Wells Creek Landslide OR-BLM-ERFO-151-3301.pdf (Acrobat, 40 KB) |
2017 | WFL | MT | MT PRA GLAC 14(3) |
Rehabilitate Many Glacier Road Slide MT-PRA-GLAC-14(3)-A.pdf (Acrobat, 46 KB) MT-PRA-GLAC-14(3)-B.pdf (Acrobat, 76 KB) MT-PRA-GLAC-14(3)-C.pdf (Acrobat, 76 KB) |
2017 | WFL | MT | MT DOT 543(1) |
North of Jordan MT-DOT-543(1).pdf (Acrobat, 126 KB) |
2017 | WFL | OR | OR DOT 26(2) |
Mirror Lake Trailhead Relocation OR-DOT-26(2).pdf (Acrobat, 52 KB) |
2017 | WFL | WA | WA FS ERFO 2016(1)-22(1) |
Cowlitz Valley Road Repairs WA-FS-ERFO-2016(1)-22(1).pdf (Acrobat, 45 KB) |
2017 | WFL | OR | OR BLM ERFO 151-3203, OR BLM ERFO 2016(1)-32(1) |
Medford District Roads 2015/Medford District Roads 2016 OR-BLM-ERFO-151-3203.pdf (Acrobat, 160 KB) |
2017 | WFL | WA | WA NPS OLYM 2016(1) |
Spruce Railroad Trail Segment A WA-NPS-OLYM-2016(1).pdf (Acrobat, 95 KB) |
2017 | WFL | WA | WA FS ERFO 2016(1)-23(2) |
Okanogan-Wenatchee 2016 Repairs, Phase 1 WA-FS-ERFO-2016(1)-23(2).pdf (Acrobat, 119 KB) |
2017 | WFL | OR | OR WASH 2015(2) |
Hagg Lake Perimeter Road, MP 2.7 Slide Repair Project OR-WASH-2015(2).pdf (Acrobat, 127 KB) |
2017 | WFL | MT | MT FLATHEAD 917(2) |
Blacktail Road Surface Improvement Phase 2 MT-FLATHEAD-917(2).pdf (Acrobat, 140 KB) |
2017 | WFL | AK | AK FS CNF 1015(1) |
Russian River Campground Access Phase 1 AK-FS-CNF-1015(1).pdf (Acrobat, 156 KB) |