Archived Bid Tabulations
As of October 1, 2021 all Bid Tabulations are now posted with their respective project on SAM.gov.
Fiscal years run from October 1 through September 30 of the following year. So, for example, FY 2020 runs from October 1, 2019 through September 30, 2020. Click on a link below to view details for a specific contract.
Filter by:
Fiscal Year:
Division:
State:
Current View: There are 21 records in 2019, EFL, all states (sorted by Project Name in descending order).
2019 | EFL | VI | VI ST ER STT(003), STJ(001) |
Storm Damage Repairs on Route 37, Route 40, and Route 303 on St. Thomas, and Route 10 on St. John VI-ST-ER-STT(003)-STJ(001).pdf (Acrobat, 744 KB) |
2019 | EFL | VI | VI ERFO NPS 2017-1(1) |
Storm Damage Repairs on North Shore Road (Route 20) and John Head Road (Route 103) VI-ERFO-NPS-2017-1(1).pdf (Acrobat, 720 KB) |
2019 | EFL | NC | NC ERFO FS 2016-1(1) |
Storm Damage Repairs of 15 sites in the Nantahala and Pisgah National Forests NC-ERFO-FS-2016-(1).pdf (Acrobat, 689 KB) |
2019 | EFL | KY | KY ERFO FS 2016-1(1) |
Slope Failure Repairs and Spot Road Reconstruction at Two Locations Along Nfsr 918 Zilpo Road KY-ERFO-FS 2016-1(1).pdf (Acrobat, 740 KB) |
2019 | EFL | WI | WI ERFO FS 2016-1(2) |
Roadway Reconstruction and Drainage Repairs WI-ERFO-FS-2016-1(2).pdf (Acrobat, 691 KB) |
2019 | EFL | VT | FW-SICO 10(1), 104(1), 105(1) |
Roadway reconstruction and drainage improvement FW-SICO-10(1)-104(1)-105(1).pdf (Acrobat, 805 KB) |
2019 | EFL | MD | NP BAWA 1(8), 2(8) |
Resurfacing of Baltimore-Washington Parkway NP-BAWA-1(8)-2(8).pdf (Acrobat, 1.25 MB) |
2019 | EFL | MS | NP-NATR 3O19, 3P24 |
Resurfacing Natchez Trace Parkway from MP 102.42 to MP 110 NP-NATR-3o19-3P24.pdf (Acrobat, 751 KB) |
2019 | EFL | WV | WV ERFO FS 2016-1(4) |
Repair of Williams River Road from Milepost 8.0 to 11.1 WV-ERFO-FS-2016-1(4).pdf (Acrobat, 734 KB) |
2019 | EFL | WV | WV ERFO FS 2016-1(3) |
Repair of Williams River Road from Milepost 12.0 to 14.7 WV-ERFO-FS-2016-1(3).pdf (Acrobat, 730 KB) |
2019 | EFL | TN | GRSM 15(1) |
Repair Bote Mountain Tunnel NP-GRSM-15(1).pdf (Acrobat, 738 KB) |
2019 | EFL | AZ | AZ FTFW BUAI 10(3), 11(1) |
Rehabilitation of Refuge Entrance Road, Pronghorn Tour Loop Road, and Visitor Center AZ-FTFW-BUAI-10(3)-11(1).pdf (Acrobat, 796 KB) |
2019 | EFL | AR | AR ERFO BUFF 2015-1(2) |
Rehabilitation of Erbie Road, Cove creek Crossing, and Erbie Crossing AR-BUFF-2015-1(2).pdf (Acrobat, 680 KB) |
2019 | EFL | WV | WV ERFO FS 2016-1(7) |
Reconstruction of Rattle Snake Bridge and Replacement of Pipe Culverts WV-ERFO-FS-2016-1(7).pdf (Acrobat, 702 KB) |
2019 | EFL | KY | NP-MACA 13(1), 14(2) |
Reconstruction of Green River Ferry Road ramps NP-MACA-13(1)-14(2).pdf (Acrobat, 908 KB) |
2019 | EFL | IL | FW-UPSA 101(1) |
Pavement rehabilitation, drainage improvements, reconstruction of overlook turnaround and three parking areas FW-UPSA-101(1).pdf (Acrobat, 796 KB) |
2019 | EFL | VA | FW-OCBA T302(1) |
Occoquan Bay National Wildlife Refuge FW-OCBA-T302(1).pdf (Acrobat, 1.02 MB) |
2019 | EFL | VA | NP GWMP 1(2), 2(4) |
Interim Pavement Repairs on GWMP North Section & Clara Barton Parkway NP-GWMP-1(2)-2(4).pdf (Acrobat, 683 KB) |
2019 | EFL | MD | NP GREE 11(1) |
Greenbelt Park NP-GREE-11(1).pdf (Acrobat, 634 KB) |
2019 | EFL | WI | WI ERFO FS 2016-1(3) |
Chequamegon-Nicolet National Forest WI-ERFO-FS-2016-1(3).pdf (Acrobat, 695 KB) |
2019 | EFL | WI | WI ERFO FS 2016-1(5) |
Chequamegon-Nicolet National Forest WI-ERFO-FS-2016-1(5).pdf (Acrobat, 708 KB) |