South Lake Road

Project Description

This project will pulverize and repave 6.9 miles of South Lake Road from the intersection with State Route 168 to South Lake. It includes minor widening (along the first 2.1 miles) to accommodate a widened, multi-use shoulder in addition to grading, pulverization of existing pavement, replacement of minor drainage structures, spot repairs to major drainage structures, slope stabilization, rock scaling, placement of crushed aggregate base and asphalt pavement, signing, striping, and other safety-related features.

Key Project Dates

Advertise: Fall 2019
Construction: Spring – Fall 2020

Project Photo

Typical roadway section

Typical roadway section.

Environmental Documents

Map showing general vicinity of project
View a larger interactive map of the project area.

Project Details
Project # CA FLAP INY CR2022(1)
Project Name South Lake Road
Location Inyo County
FLMA Inyo National Forest
Status In Development

Contact Information

Project Manager: Wendy Longley
Phone: 720-963-3394
Email: Wendy.Longley@dot.gov

Federal Highway Administration
Central Federal Lands Highway Division
12300 West Dakota Avenue
Lakewood, CO 80228
720-963-3500