Fort Dupont and Fort Davis Drives and Associated Roads Pavement Rehabilitation

Project Description

Mill and overlay Fort Dupont Drive (Route 0017), Fort Davis Drive (Route 0018), Ridge Picnic Area (Route 0019) and Ridge Picnic Area Loop (Route 0206), asphalt concrete pavement patches, roadway realignment and reconstruction at Lanham Estates Loop Road (Route 0118), pavement markings, and other miscellaneous work. The project can be accessed by Ridge Road from the north, Randle Circle SE from the west, Pennsylvania Avenue from the south, and Alabama Avenue from the east.

Key Project Dates


Advertisement: Winter 2017/2018
Award Letter: Spring 2018
Construction: Spring 2018 - Fall 2018

Project Photos

ALTCAPTIONTEXT

Typical existing asphalt surface condition at Lanham Estates Loop Road


ALTCAPTIONTEXT

Typical existing pavement condition that will require pavement patching at Fort Dupont Drive

Map showing general vicinity of project
View a larger interactive map of the project area.

Project Details
Project # NACE 17(2), 18(2), 19(2), 118(1), 206(1)
Project Name Fort Dupont and Fort Davis Drives and Associated Roads Pavement Rehabilitation
Location Washington, District of Columbia
FLMA or Partner(s): National Capital Parks - East, National Park Service
Status In Design

Contact Information

Project Manager: Michael Tessitore
Phone: 703-948-1404
Email: michael.tessitore@dot.gov

Federal Highway Administration
Eastern Federal Lands Highway Division
21400 Ridgetop Circle
Sterling, Virginia 20166