HI STP H1(1) HALONA STREET BRIDGE

Project Overview

The Central Federal Lands Highway Division of the Federal Highway Administration in cooperation with the Hawaii Department of Transportation is developing a project located on Halona Street, adjacent to Interstate Route H-1, at M.P 20.21, (Kapalama Canal) the Halona Street Bridge, on the Island of Oahu.

A Final Environmental Assessment (EA) and Finding of No Significant Impact (FONSI) has been prepared pursuant to HRS Chapter 343 (as amended), and Hawaii Administrative Rules Title 11, Chapter 200.  The document is available for download and review by clicking on All Documents link on the left side of this page.

Project Details:

In Development
Island of Oahu, HI

The proposed project is located across Kapalama Canal on Halona Street, adjacent to the Houghtailing Street off-ramp of the H-1 Freeway westbound. The project would improve the safety and reliability of the existing bridge, through rehabilitation or replacement, addressing bridge width, load capacity, pedestrian traffic, bridge railing and transitions, and bridge approaches.


Update 9/1/17:

Construction: On-site construction activities were initiated in late January with the closure of Halona Street. The existing bridge has been removed, the foundations, bridge girders, and deck have been completed. The contractor is nearing completion, with an estimated opening for public use scheduled for mid September 2017.


Update 8/1/17:

Construction: On-site construction activities were initiated in late January with the closure of Halona Street. The existing bridge has been removed, the foundations, bridge girders, and deck have been completed. The contractor is scheduled to begin work on the bridge railing and roadway approaches in August 2017. Project completion is scheduled for September 2017.

Traffic Management: Halona Street is planned to be closured for the duration of the bridge replacement work. Traffic will be detoured in accordance with the attached map.


Update 7/1/17:

Construction: On-site construction activities were initiated in late January with the closure of Halona Street. The existing bridge has been removed, the foundations have been prepared and bridge girders have been placed. The contractor is scheduled to begin the concrete deck pour in mid-July.

Traffic Management: Halona Street is planned to be closured for the duration of the bridge replacement work. Traffic will be detoured in accordance with the attached map.


Update 6/1/17:

Construction: On-site construction activities were initiated in late January with the closure of Halona Street. The existing bridge has been removed and the contractor is preparing the foundations for the new bridge. Bridge piles have been placed and the contractor is beginning to pour the pier caps and abutment foundations.

Traffic Management: Halona Street is planned to be closured for the duration of the bridge replacement work. Traffic will be detoured in accordance with the attached map.


Comments
Construction Amount Between $5,000,000 and $10,000,000

Sections

Map showing general vicinity of project
View a larger interactive map of the project area.

Project Details
Project #
Project Name HI STP H1(1) HALONA STREET BRIDGE
Location Island of Oahu
Status Under Construction
Awarded to Kiewit Construction
Award Date 11/28/2016
Award Amount $7,156,542.40

Contact Information

Project Manager

Mike Will
Central Federal Lands Highway Division
Attn: Mike Will
12300 West Dakota Avenue
Lakewood, CO   80228
Phone: 720-963-3647
Fax: 720.963.3596