HI STP SR83(2) KAWELA STREAM BRIDGE

Project Overview

The Central Federal Lands Highway Division of the Federal Highway Administration in cooperation with the Hawaii Department of Transportation is developing a project located on Kamehameha Highway (Route 83) at Mile Post 11.39, the Kawela Stream Bridge, on the Island of Oahu.

A Final Environmental Assessment (EA) and Finding of No Significant Impact (FONSI) has been prepared pursuant to HRS Chapter 343 (as amended), and Hawaii Administrative Rules Title 11, Chapter 200. The document is available for download by clicking on the "All Documents" link on the left side of this page.

http://flh.fhwa.dot.gov/kawela - Supplemental Site

Project Details:

In Development
Island of Oahu, HI

The proposed project is located on the Kamehameha Highway (Route 83) at mile post 11.39, west of the Kawela Camp Road intersection and Turtle Bay Resort. The project would improve the safety and reliability of the existing bridge, through rehabilitation or replacement of the structure, addressing bridge width, load capacity, bridge railing and transitions, and bridge approaches.


Update 3/1/17:

Environment: The public comment period for the Draft EA closed on November 7, 2016. The project Team is reviewing and analyzing public comment to the Draft EA. Preparation of the final EA is in process.

Project Development: Preparation of Design Build Request for Proposal documentation is currently underway.

Utilities: Coordination is underway with the utility agencies to prepare agreements for temporary and permanent relocations.

Right of Way: Land owner boundary mapping and project right of way needs have been developed and approved. Landowner meetings and appraisals have been initiated for affected landowners.

Construction: Funding has been identified for this project. A Design Build RFQ is planned to be issued in April 2017.


Update 2/1/17:

There is no new information to share at this time.


Update 1/1/17:

Environment: The public comment period for the Draft EA closed on November 7, 2016. The project Team is reviewing and analyzing public comment to the Draft EA. Preparation of the final EA is in process.

Project Development: Preparation of Design Build Request for Proposal documentation is currently underway.

Utilities: Coordination is underway with the utility agencies to prepare agreements for temporary and permanent relocations.

Right of Way: Land owner boundary mapping and project right of way needs have been developed and approved. Landowner meetings and appraisals have been initiated for affected landowners.

Construction: Funding has been identified for this project. A Design Build RFP is planned to be issued in March/April 2017.


Update 12/1/16: There is no new information to share at this time.


Update 11/1/16: There is no new information to share at this time.
Update 10/1/16: There is no new information to share at this time.
Comments
Construction Amount Between $1,000,000 and $5,000,000

Sections

Map showing general vicinity of project
View a larger interactive map of the project area.

Project Details
Project #
Project Name HI STP SR83(2) KAWELA STREAM BRIDGE
Location Island of Oahu, Hawaii
Status In Development
Awarded to
Award Date
Award Amount

Contact Information

Project Manager

Mike Will
Central Federal Lands Highway Division
Attn: Mike Will
12300 West Dakota Avenue
Lakewood, CO   80228
Phone: 720-963-3647
Fax: 720.963.3596
michael.will@dot.gov

Last Revised Date: 10-13-2016