HI STP SR83(1) HOOLAPA STREAM BRIDGE (NANAHU)

Project Overview

The Central Federal Lands Highway Division of the Federal Highway Administration in cooperation with the Hawaii Department of Transportation is developing a project located on the Kamehameha Highway, Route 83, M.P. 13.39, (Hoolapa Stream) Nanahu Bridge, on the Island of Oahu.

A Final Environmental Assessment (EA) and Finding of No Significant Impact (FONSI) has been prepared pursuant to HRS Chapter 343 (as amended), and Hawaii Administrative Rules Title 11, Chapter 200. The document is available for download by clicking on the "All Documents" link on the left side of this page.

Project Details

In Development
Island of Oahu, HI

The proposed project is located on the Kamehameha Highway (Route 83) at mile post 13.39, west of the Marconi Road intersection in Kahuku. The project would improve the safety and reliability of the existing bridge, through rehabilitation or replacement, addressing bridge width, load capacity, bridge railing and transitions, and bridge approaches.


Update 9/1/2017:

There is no new information to share at this time.


Update 8/1/17:

Construction: Funding has been identified for this project. A Design Build RFQ is planned to be issued in late September 2017. The solicitation, when available, can be found through the Federal Business Opportunities website at www.fbo.gov


Update 7/1/17:
Construction: Funding has been identified for this project. A Design Build RFQ is planned to be issued in late July 2017. The solicitation, when available, can be found through the Federal Business Opportunities website at www.fbo.gov


Update 6/1/17:
Construction: Funding has been identified for this project. A Design Build RFQ is planned to be issued in June 2017. The solicitation, when available, can be found through the Federal Business Opportunities website at www.fbo.gov.


Update 5/1/17

Environment: The final EA FONSI was authorized on February 28, 2017 and is available for download by accessing the "All Documents" tab on this webpage.

Project Development: Preparation of Design Build Request for Proposal documentation is currently underway.

Utilities: Coordination is underway with the utility agencies to prepare agreements for temporary and permanent relocations.

Right of Way: Land owner boundary mapping and project right of way needs have been developed and approved. Landowner meetings and appraisals have been initiated for affected landowners.

Construction: Funding has been identified for this project. A Design Build RFQ is planned to be issued in April / May 2017.


Comments
Construction Amount Between $1,000,000 and $5,000,000

Sections

Map showing general vicinity of project
View a larger interactive map of the project area.

Project Details
Project # HI STP SR83(1)
Project Name HOOLAPA STREAM BRIDGE (NANAHU)
Location Island of Oahu
Status In Development

Contact Information

Project Manager

Mike Will
Central Federal Lands Highway Division
Attn: Mike Will
12300 West Dakota Avenue
Lakewood, CO   80228
Phone: 720-963-3647
Fax: 720.963.3596
michael.will@dot.gov