HI STP SR 560(1) WAINIHA STREAM BRIDGES NOS 1, 2, and 3

Project Overview

The Central Federal Lands Highway Division of the Federal Highway Administration in cooperation with the Hawaii Department of Transportation is developing a project located on Kuhio Highway (Route 560) between mile post 6.4 and 6.7 near the mouth of Wainiha Stream before it feeds into Wainiha Bay on the island of Kauai. The purpose of the project is to replace three temporary bridges with permanent structures. The proposed project includes the replacement of three temporary bridges on Kuhio Highway (Route 560) on the north shore in the Hanalei District. The bridges are located between mile posts 6.4 and 6.7 near the mouth of Wainiha Stream before it feeds into Wainiha Bay. The original bridges at these three locations were replaced with temporary prefabricated, modular (ACROW) bridges after Bridge #2 suffered permanent damage and Bridges #1 (the southern-most bridge) and #3 (the northern-most bridge) were determined to be structurally deficient.

The ACROW bridges were installed as a temporary measure to keep the roadway open to residential and public traffic until environmental clearance and funding for the permanent structures could be secured. There are three load-restricted bridges that cross Waioli, Waipa, and Waikoko streams (located at MP 3.39, MP 3.9, and 4.22, respectively) that must be crossed to access the Wainiha Stream bridges. These bridges may be unable to accommodate construction loads, and alternatives such as temporary bridges or supplemental supports will be studied to provide for construction access.

A Final Environmental Assessment (EA) and Finding of No Significant Impact (FONSI) has been prepared pursuant to HRS Chapter 343 (as amended), and Hawaii Administrative Rules Title 11, Chapter 200. The document is available for download by clicking All Documents on the left side of this page.

Project Details:

In Development
Island of Kauai, HI


Update 6/1/2018

The Final Environmental Assessment, Finding of No Significant Impact can be found on this webpage by accessing the “All Documents” tab on this webpage. Ongoing activities include finalizing the design plans, right of way acquisition, and utility coordination. Funding for construction has not been secured for this project as it is dependant on availability with consideration of other statewide priorities.


Update 5/1/2018

There is no new information to share at this time.


Update 4/1/2018:

Construction: There is no new information to share at this time.


Update 3/1/2018

The Final EA, Finding of No Significant Impact can be found on this webpage by accessing the “All Documents” tab on this webpage. Ongoing activities include finalizing the design plans, right of way acquisition, and utility coordination.


Update 2/1/2018

The Final EA is being routed for agency review and approval. Upon completion of the Final EA, design, right of way acquisition, and utility coordination activities will resume.


Comments
Construction Amount Between $10,000,000 and $25,000,000

Sections

Map showing general vicinity of project
View a larger interactive map of the project area.

Project Details
Project # HI STP SR 560(1)
Project Name WAINIHA STREAM BRIDGES NOS 1, 2, and 3
Location Island of Kauai
Status In Development

Contact Information

Project Manager: Thomas Parker