Baltimore - Washington Parkway Resurfacing, Signing and Striping from the Beaver Dam Road Bridge to the Patuxent River Bridge

Project Description

Project includes resurfacing of an approximately 3.7-mile section of the Baltimore -Washington Parkway (between the Beaver Dam Road Bridge and the Patuxent River Bridge), the ramps at the interchange with Powder Mill Road, selected section on the ramps at the interchange with Explore Road. Work also includes repairing distressed areas with asphalt concrete pavement patching, milling and paving, pavement markings, shoulder rumble strips, signage replacements, and other miscellaneous work.

Key Project Dates


Advertisement: Winter 2017/2018
Construction: Spring 2018 - Fall 2018

Project Photos

ALTCAPTIONTEXT

Parkway pavement section - some patching will be required

ALTCAPTIONTEXT

General view of the Parkway pavement

Map showing general vicinity of project
View a larger interactive map of the project area.

Project Details
Project # BAWA 1(5), 2(5)
Project Name Baltimore - Washington Parkway Resurfacing, Signing and Striping from the Beaver Dam Road Bridge to the Patuxent River Bridge
Location Prince George County, Maryland
FLMA or Partner(s): Baltimore - Washington Parkway, National Park Service
Status Under Construction

Contact Information

Project Manager: Katerina Roman
Phone:703-404-6291
Email: katerina.roman@dot.gov

Federal Highway Administration
Eastern Federal Lands Highway Division
21400 Ridgetop Circle
Sterling, Virginia 20166