Kolob Canyon

Project Description

The proposed project will include pulverize and pavement, or similar treatment type for approximately 5.35 miles long of the Kolob Canyon Road, Route 13. Culverts will be analyzed and upsized or replaced where needed. Existing guardrail sections will be replaced to meet standards. Features such as curb, pullouts, and road widths will be evaluated for removal, replacement, reduction in size, or reshaping and will create standard road widths through the length of the route. Accessibility enhancements will be considered at all pullout locations that are rebuilt as part of this project, including 17 lookout locations. Rock fall areas will be assessed to determine a possible solution. The road is owned and maintained by the National Park Service.

Key Project Dates

Advertise: Fall 2017
Construction: May 2018

Project Photos

Current Road Conditions

Current road conditions.


Current Road Conditions

Current road conditions.

Map showing general vicinity of project
View a larger interactive map of the project area.

Project Details
Project # UT FTNP ZION 13(1)
Project Name Kolob Canyon
Location Kane County
FLMA National Park Service
Status Under Construction

Contact Information

Project Manager: James Kerrigan
Phone: 720-963-3362
Email: James.Kerrigan@dot.gov

Federal Highway Administration
Central Federal Lands Highway Division
12300 West Dakota Avenue
Lakewood, CO 80228
720-963-3500