Project Description

The work includes roadway reconstruction, drainage improvements and other miscellaneous work on four sites at Silvio O. Conte National Wildlife Refuge (NWR) and one site at Umbagog NWR. The work items include embankment construction, granular backfill, aggregate surface course, concrete box culverts, replacement of large pipe culverts, headwall construction, cellular confinement system, and other miscellaneous work. The site in Umbagog NWR is located on Potter Farm Road close to the intersection with Mountain Pond Road off State Route 26. The sites in Silvio O. Conte NWR are located on Lewis Pond Road, Eagle Nest Road, and Tin Shack Road, and can be accessed from US Route 105.

Key Project Dates


Advertisement: Spring 2018
Construction: Summer 2018 - Fall 2018

Project Photos

ALTCAPTIONTEXT

Site of the future box culvert at Umbagog NWR

ALTCAPTIONTEXT

Site of the future corrugated metal arch culvert in Silvio O. Conte NWR

Map showing general vicinity of project
View a larger interactive map of the project area.

Project Details
Project # LAUM 103(1), SICO 10(1), 104(1), 105(1)
Project Name Umbagog and Silvio O. Conte National Fish and Wildlife Refuges Roadway Reconstruction and Drainage Improvements
Location Essex County, Vermont
FLMA or Partner(s): Umbagog and Silvio O. Conte National Fish and Wildlife Refuges, US Fish and Wildlife Service
Status In Development

Contact Information

Project Manager: Nilesh Makwana
Phone:703-404-6286
Email: Nilesh.Makwana@dot.gov

Federal Highway Administration
Eastern Federal Lands Highway Division
21400 Ridgetop Circle
Sterling, Virginia 20166