Questions
Send questions or comments to the EFLHD Details team.
EFLHD Detail Drawings (ORD Version): FP-14
Detail drawings are used on a continuing basis within each division to clarify the work required in the plans. EFLHD Detail Drawings are arranged by FP section.
FLH Standard Drawings currently in use that have not been formally approved through FLH Headquarters are also available. These Standards have a status of Draft, Un-Approved, or Awaiting FLH Approval. These yet to be approved Standards have been converted for use as EFLHD Details, temporarily, while they proceed through the approval process. The Detail Number for these drawings has been revised to add an "ET" (Eastern Temporary) prefix in order to keep track of their use in the plans. Upon FLH approval of the Standards, the temporary EFLHD Details will be removed from our library and substituted in the plans.
The drawings are available in MicroStation (DGN) and Acrobat (PDF) formats. Files contain drawings in both US Customary and Metric units. To get the desired units in the MicroStation drawings, choose the pertinent model (File -> Models).
157 - Soil Erosion and Sediment Control | Date | |||
---|---|---|---|---|
![]() |
![]() |
E157-01 | Stabilized Construction Exit | 09-2020 |
![]() |
![]() |
E157-02 | Wire-Backed Silt Fence | 09-2020 |
![]() |
![]() |
E157-04 | Fiber Roll | 09-2020 |
![]() |
![]() |
E157-06 | Check Dam with Rolled Erosion Control Product | 09-2020 |
![]() |
![]() |
E157-08 | Temporary In-Stream Diversion Methods | 03-2021 |
![]() |
![]() |
E157-09 | Temporary Diversion Berm Bypass Pumping | 11-2020 |
![]() |
![]() |
E157-10 | Filter Bag | 09-2020 |
![]() |
![]() |
E157-11 | Floating Turbidity Curtain | 11-2020 |
Top | ||||
204 - Soil Excavation and Embankment | Date | |||
![]() |
![]() |
E204-01 | Cut and Fill Slope Transitions | 09-2020 |
![]() |
![]() |
E204-02 | Benching for Embankment | 09-2020 |
![]() |
![]() |
E204-04 | Reinforcement Soil Slope (RSS) with Brushlayering | 09-2020 |
![]() |
![]() |
E204-05 | Roadway Connections | 09-2020 |
Top | ||||
251 - Riprap | Date | |||
![]() |
![]() |
E251-01 | Placed Riprap at Culvert Outlets (2 Sheets) | 10-2021 |
![]() |
![]() |
E251-02 | Loose Riprap Channel at Culvert | 09-2020 |
Top | ||||
252 - Rockery, Special Rock Embankment, and Rock Buttress | Date | |||
![]() |
![]() |
E252-01 | Mechanically Placed Rock Embankment | 09-2020 |
Top | ||||
253 - Gabion Retaining Wall | Date | |||
![]() |
![]() |
E253-01 | Gabion Retaining Wall | 09-2020 |
Top | ||||
401 - Asphalt Concrete Pavement by Gyratory Mix Design Method | Date | |||
![]() |
![]() |
E401-01 | Pavement Transitions | 09-2020 |
Top | ||||
414 - Asphalt Pavement Crack Sealing and Filling | Date | |||
![]() |
![]() |
E414-01 | Crack Sealing and Filling Asphalt Pavement | 09-2020 |
Top | ||||
501 - Minor Concrete Pavement | Date | |||
![]() |
![]() |
ET501-1 | Minor Concrete Pavement | 09-2020 |
![]() |
![]() |
ET501-2 | Minor Concrete Pavement Joints | 09-2020 |
Top | ||||
502 - Concrete Pavement Restoration | Date | |||
![]() |
![]() |
ET502-1 | Concrete Pavement Restoration | 09-2020 |
Top | ||||
556 - Bridge Railing | Date | |||
![]() |
![]() |
ET556-1 | Tubular Steel-Backed Timber Bridge Rail (2 Sheets) | 09-2020 |
Top | ||||
601 - Minor Concrete Structures | Date | |||
![]() |
![]() |
ET601-4 | Concrete Headwall for Small Pipe Culverts | 09-2020 |
Top | ||||
602 - Culverts and Drains | Date | |||
![]() |
![]() |
E602-01 | Metal Pipe Culvert | 09-2020 |
![]() |
![]() |
E602-07 | Concrete Pipe Culvert Installation | 09-2020 |
![]() |
![]() |
E602-08 | Elliptical Concrete Pipe | 09-2020 |
![]() |
![]() |
E602-09 | Elliptical Concrete Pipe Culvert Installation | 09-2020 |
![]() |
![]() |
E602-10 | Concrete End Section for Elliptical Concrete Pipe | 09-2020 |
![]() |
![]() |
ET602-3 | Metal and Plastic Pipe Culvert Bedding | 09-2020 |
![]() |
![]() |
ET602-4 | Metal End Sections | 09-2020 |
![]() |
![]() |
ET602-5 | Plastic Pipe Culvert | 09-2020 |
![]() |
![]() |
ET602-7 | Concrete Pipe Culvert Installation | 09-2020 |
![]() |
![]() |
ET602-9 | Metal End Sections with Safety Bars | 09-2020 |
Top | ||||
604 - Manholes, Inlets and Catch Basins | Date | |||
![]() |
![]() |
E604-01 | Inlet, Type 4A, 4B, and 4C | 09-2020 |
![]() |
![]() |
E604-02 | Inlet, Type 4D (2 sheets) | 09-2020 |
![]() |
![]() |
E604-03 | Inlet, Type 5A Modified | 09-2020 |
![]() |
![]() |
E604-04 | Inlet, Type 5B | 09-2020 |
![]() |
![]() |
E604-05 | Inlet, Type 6A | 09-2020 |
![]() |
![]() |
E604-06 | Junction Box | 09-2020 |
![]() |
![]() |
E604-07 | Spring Box | 09-2020 |
![]() |
![]() |
E604-08 | Precast Concrete Inlet Cap | 09-2020 |
![]() |
![]() |
E604-09 | Inlet, Type 6A-6 & Metal Frame and Grate (Curved Vane Grate) (2 Sheets) | 11-2021 |
Top | ||||
605 - Underdrains, Sheet Drains, and Pavement Edge Drains | Date | |||
![]() |
![]() |
E605-01 | Underdrain, For Pavement and Ditches | 09-2020 |
![]() |
![]() |
E605-02 | Underdrain, For Fill Slopes | 09-2020 |
![]() |
![]() |
E605-03 | Underdrain, For Cut Slopes | 09-2020 |
Top | ||||
608 - Paved Waterways | Date | |||
![]() |
![]() |
E608-03 | Paved Waterway, Type 3 (Concrete and Rubble) | 09-2020 |
![]() |
![]() |
E608-04 | Paved Waterway, Type 4 (Concrete) | 09-2020 |
![]() |
![]() |
E608-05 | Paved Waterway, Type 5 (Asphalt) | 09-2020 |
Top | ||||
609 - Curb and Gutter | Date | |||
![]() |
![]() |
E609-01 | Curbs | 09-2020 |
![]() |
![]() |
E609-02 | Granite Curb | 09-2020 |
![]() |
![]() |
E609-03 | Concrete Wheelstop | 09-2020 |
Top | ||||
615 - Sidewalks, Drive Pads and Paved Medians | Date | |||
![]() |
![]() |
E615-01 | Concrete Sidewalk | 09-2020 |
![]() |
![]() |
E615-02 | Asphalt Concrete Sidewalk | 09-2020 |
![]() |
![]() |
E615-05 | Accessibility Ramp Curb Return | 09-2020 |
![]() |
![]() |
ET615-1 | Wheelchair Ramp Curb Cut | 09-2020 |
![]() |
![]() |
ET615-2 | Wheelchair Ramp Curb Taper | 09-2020 |
Top | ||||
617 - Guardrail | Date | |||
![]() |
![]() |
E617-13 | G4 W-Beam Guardrail BCT and Melt Anchorage Assembly | 09-2020 |
![]() |
![]() |
E617-23 | G4 W-Beam Guardrail Supplement Installations |
09-2020 |
![]() |
![]() |
E617-24 | G4 W-Beam Guardrail Placement At Minor Structures and Pipe Culverts |
09-2020 |
![]() |
![]() |
E617-29 | G4 W-Beam Guardrail Connection to Structure Safety Shape Face Rubrail | 09-2020 |
![]() |
![]() |
E617-32 | G4 W-Beam Guardrail Flared back Parapet Wall and Safety Shape Transition | 09-2020 |
![]() |
![]() |
E617-67 | Steel-Backed Timber Guardrail Test Level 2 Transition to Straight or Curved End Structure (3 Sheets) | 09-2020 |
![]() |
![]() |
E617-70 | Steel-Backed Timber Guardrail, Median, Type A | 02-2022 |
![]() |
![]() |
ET617-61 | Steel-Backed Timber Guardrail Terminal Section, Type SBT-FAT | 09-2020 |
![]() |
![]() |
ET617-64 | Steel-Backed Timber Guardrail TL-2 Connection to Stone Masonry Guardwall (3 sheets) | 09-2020 |
![]() |
![]() |
ET617-65 | Steel-Backed Timber Guardrail TL-3 Connection to Stone Masonry Guardwall (2 sheets) | 09-2020 |
![]() |
![]() |
ET617-66 | Steel-Backed Timber Guardrail Connection to Curved Back Structure (3 sheets) | 09-2020 |
![]() |
![]() |
ET617-68 | Steel-Backed Timber Guardrail Connection to Tubular Steel-Backed Timber Bridge Rail | 09-2020 |
![]() |
![]() |
ET617-69 | TL-2 End Terminal for Steel-Backed Timber Guardrail (2 Sheets) | 09-2020 |
Top | ||||
619 - Fences, Gates, Cattle Guards and Bollard Posts | Date | |||
![]() |
![]() |
E619-01 | Fence, Split Rail, 7-Rail Height | 09-2020 |
![]() |
![]() |
E619-02 | Fence, Barbed Wire |
09-2020 |
![]() |
![]() |
E619-03 | Wood Bollard |
09-2020 |
![]() |
![]() |
E619-04 | 16 FT and 28 FT Gates (2 Sheets) |
09-2020 |
![]() |
![]() |
E619-06 | Metal Gate, 30 Feet |
09-2020 |
![]() |
![]() |
E619-07 | Residential Chain Link Fence & Gate (2 Sheets) |
09-2020 |
![]() |
![]() |
E619-09 | Chain Link Fence & Gate (2 Sheets) |
09-2020 |
![]() |
![]() |
E619-11 | Post & Chain |
09-2020 |
![]() |
![]() |
E619-12 | Wood Stockade Fence |
09-2020 |
![]() |
![]() |
E619-13 | Metal Gate with Breakaway Supports, 26-Foot Width (2 Sheets) |
09-2020 |
![]() |
![]() |
ET619-1 | Cattle Guard |
09-2020 |
![]() |
![]() |
ET619-2 | Cattle Guard |
09-2020 |
![]() |
![]() |
ET619-3 | Cattle Guard Precast Foundation |
09-2020 |
Top | ||||
620 - Stone Masonry | Date | |||
![]() |
![]() |
E620-01 | Stone Masonry Headwalls for Small Pipe Culverts | 09-2020 |
![]() |
![]() |
E620-03 | Stone Masonry Guardwall Terminal Section, Type BAT |
09-2020 |
![]() |
![]() |
E620-50 | TL-2 Stone Masonry Guardwall, Double-Face (2 sheets) |
09-2020 |
Top | ||||
621 - Monument and Markers | Date | |||
![]() |
![]() |
E621-01 | Right-Of-Way Marker | 09-2020 |
Top | ||||
626 - Plants, Trees, Shrubs, Vines, and Groundcovers | Date | |||
![]() |
![]() |
E626-01 | Trees And Shrubs Planting Methods | 09-2020 |
Top | ||||
629 - Rolled Erosion Control Products and Cellular Confinement Systems | Date | |||
![]() |
![]() |
E629-01 | Slope Stabilization with Rolled Erosion Control Product (RECP) | 09-2020 |
![]() |
![]() |
E629-02 | Ditch Stabilization with Rolled Erosion Control Product (RECP) |
09-2020 |
![]() |
![]() |
E629-03 | Pipe Inlet Stabilization with Rolled Erosion Control Product (RECP) |
09-2020 |
Top | ||||
633 - Permanent Traffic Control | Date | |||
![]() |
![]() |
E633-01 | Sign Structures | 09-2020 |
![]() |
![]() |
E633-02 | Breakaway Sign Support Corrosion Resistant Steel |
09-2020 |
![]() |
![]() |
E633-03 | Breakaway Sign Support Wood and Steel Posts |
09-2020 |
![]() |
![]() |
E633-04 | Sign Bracing | 09-2020 |
![]() |
![]() |
E633-05 | Folding Sign Connections | 09-2020 |
Top | ||||
634 - Permanent Pavement Markings | Date | |||
![]() |
![]() |
E634-01 | Pavement Markings Symbols and Words |
09-2020 |
![]() |
![]() |
E634-02 | Raised Pavement Markers | 09-2020 |
![]() |
![]() |
E634-03 | Pavement Markings with and without Raised Pavement Markers | 09-2020 |
![]() |
![]() |
E634-04 | Pavement Markings in Neutral Areas (2 sheets) | 09-2020 |
![]() |
![]() |
E634-05 | Pavement Markings and Signing in Parking Areas | 08-2021 |
![]() |
![]() |
E634-06 | Pavement Markings, Pedestrian Crosswalk | 11-2021 |
Top | ||||
635 - Temporary Traffic Control | Date | |||
![]() |
![]() |
E635-01 | Temporary Traffic Control Sign Mounting |
09-2020 |
![]() |
![]() |
E635-05 | Temporary Traffic Control Single Lane Closure Layout | 09-2020 |
![]() |
![]() |
E635-08 | Temporary Traffic Control One Way, Two Lane Road Shoulder Work with Minor Encroachment (Without Barrier) | 11-2021 |
![]() |
![]() |
E635-10 | Temporary Traffic Control One Way, Two Lane Road Shoulder Work with Minor Encroachment (With Barrier) | 11-2021 |
![]() |
![]() |
E635-12 | Temporary Traffic Control Single Lane Closure Layout (With Temporary Concrete Barrier) | 09-2020 |
![]() |
![]() |
E635-14 | Flexible Pavement Markers for Temporary Use with Unmarked Pavements | 09-2020 |
![]() |
![]() |
E635-14A | Flexible Pavement Markers for Temporary Use with Unmarked Pavements - NATR Only | 09-2020 |
Top | ||||
636 - Traffic Signal, Traffic Counter, Lighting, and Electrical Systems | Date | |||
![]() |
![]() |
E636-01 | Inductive Loop Single Loop Per Lane |
09-2020 |
![]() |
![]() |
E636-02 | Inductive Loop Dual Loops Per Lane | 09-2020 |
![]() |
![]() |
E636-03 | Inductive Loop Installation | 09-2020 |
![]() |
![]() |
E636-04 | Inductive Loop Pull Box | 09-2020 |
![]() |
![]() |
E636-05 | Pull Box and Cabinet Location | 09-2020 |
![]() |
![]() |
E636-06 | Traffic Counter Cabinet with 10'-0" or 6'-0" Solar Panel Mounting Heights | 09-2020 |
![]() |
![]() |
E636-07 | Traffic Counter Cabinet with 4'- 6" Solar Panel Mounting Height | 09-2020 |
![]() |
![]() |
E636-08 | Traffic Counter Cabinet Wiring Diagram | 09-2020 |
![]() |
![]() |
E636-09 | Traffic Counter Cabinet Terminal Block Wiring Diagram | 09-2020 |