Material source

ACTIVITY: Prepare material source plan consists of the steps below.
If T&E species are affected by the materials source, that information is needed for the Biological Assessment / Biological Evaluation.

  1. Develop plan sheets and cross-sections
  2. Calculate quantities
  3. Draft reclamation plan
  4. Determine area limits
  5. Incorporate construction req into SCRs

Step 1 (Weight: 35)

Description: Develop plan sheets and cross-sections

Step 2 (Weight: 30)

Description: Calculate quantities

Step 3 (Weight: 15)

Description: Draft reclamation plan

Step 4 (Weight: 10)

Description: Determine area limits

Step 5 (Weight: 10)

Description: Incorporate construction req into SCRs