Material source
ACTIVITY: Prepare material source plan consists of the steps below.
If T&E species are affected by the materials source, that information is needed for the Biological Assessment / Biological Evaluation.
- Develop plan sheets and cross-sections
- Calculate quantities
- Draft reclamation plan
- Determine area limits
- Incorporate construction req into SCRs
Step 1 (Weight: 35)
Description: Develop plan sheets and cross-sections
Step 2 (Weight: 30)
Description: Calculate quantities
Step 3 (Weight: 15)
Description: Draft reclamation plan
Step 4 (Weight: 10)
Description: Determine area limits
Step 5 (Weight: 10)
Description: Incorporate construction req into SCRs